
/ Industries
Water Storage for Mining & Resources
Robust, engineered water infrastructure for remote mining and resources operations — built for harsh environments, compliance-critical, and operationally reliable.
/ Sector Challenges
What Mining Projects Demand
Remote Locations
Mine sites are often hundreds of kilometres from the nearest supply centre, requiring specialist logistics, FIFO crews, and remote-rated materials.
Harsh Environments
Extreme temperatures, corrosive atmospheres, dust, and UV exposure demand materials and coatings engineered for the operating environment.
Corrosion Management
Process water, chemical exposure, and harsh environments accelerate tank corrosion. RPVC liners and corrosion-resistant coatings are critical for asset longevity.
Operational Continuity
Mine sites cannot afford water supply failures. Inspection and maintenance programs that minimise downtime are essential.
/ Relevant Services
Our Mining Capability

Applicable Standards
Mining & Industrial Projects
Other Sectors We Serve
See every sector
Industrial Facilities
Reliable process water storage and fire suppression systems engineered for the demands of industrial operations.
Explore sector

Commercial & Fire Compliance
AS2304 fire water storage and AS1851 compliance for commercial properties — protecting assets, lives, and insurance coverage.
Explore sector

Remote & Regional Communities
Safe water access delivered to remote and Indigenous communities — with specialist logistics, cultural sensitivity, and genuine care.
Explore sector
Delivered Work
6 in the portfolio
Kybrook Farm Elevated Tank Replacement
1 × 90kL elevated potable water tank replacement — 316 stainless steel
Kybrook Farm, Pine Creek, NT

Clarence Road Liner Replacement
2 × tank RPVC liner replacement — compliance restoration
107 Clarence Road

Albury Reservoir Reline
600kL reservoir RPVC reline and full refurbishment — AS4020 compliance
Albury, NSW
Further Reading
From the library
Water Storage and Tank Services in Perth: WA Capital Water Storage and Desalination Context
Perth has spent two decades adapting its water supply strategy to a drying climate, with desalination now supplying a substantial share of the total water demand — a shift that reshapes how storage infrastructure is planned across the region.
6 min read

Panel Pre-Qualification vs One-Off Tender: What Councils Should Know
Councils and government agencies can procure water infrastructure work through a pre-qualified supplier panel or a one-off open tender — and the right choice depends on project frequency, urgency and internal procurement capacity.
6 min read

Whole-of-Life Costing for Water Storage Assets: Capital vs Renewal Planning
The cheapest tank on day one is not necessarily the cheapest tank over thirty years. Whole-of-life costing puts capital cost, maintenance and eventual renewal on the same ledger.
7 min read
/ FAQs
Mining & Resources — FAQs
GOT A MINE SITE WATER STORAGE CHALLENGE?
Contact us to discuss your project requirements — remote, harsh environment, and compliance-critical.
